Inquiry announcement for the renovation and procurement project of the experimental animal center on the 5th floor of building 4#

Release time:2024-05-23

1. basic situation of the project

1. project name: renovation of the experimental animal center on the 5th floor of building 4#

2. project location: jinfeng laboratory

3. procurement method: inquiry

4. procurement content: renovation of the experimental animal center on the 5th floor of building 4#. please see the table below for specific procurement information:

serial number

project name

project characteristics

unit

quantity

1

walkway railing removal

the installation of the autoclave requires removal of the walkway railings and restoration (civil engineering railings, stainless steel railings, plastering, real stone paint, etc.)

m

4.00

2

light steel keel gypsum board wall

light steel keel gypsum board removal

m3

2.10

3

conference room glass door restored after removal

original glass double doors restored after protective removal

m2

3.60

4

remove the original pvc floor

removal of original pvc floor

m2

56.9

5

handmade color steel plate partition wall (double-sided glass magnesium)

50mm handmade metal-sided double-sided glass magnesium rock wool sandwich color steel plate, the overall plate thickness is 50mm, rock wool volume density ≥100kg/m³; steel plate thickness 0.426mm; 0.7mm high-strength galvanized keel; including r50 aluminum alloy internal and external arcs corners, lifting manger and other auxiliary materials.

m2

33.6

6

steel plate

the floor is covered with steel plate, q235b 10mm thick

m2

4.00

7

floor (ground) surface coating film waterproofing

1. types of waterproof membrane: polymer cement-based waterproof coating

2. coating film thickness and number of passes: 2mm thick, two passes

m2

56.9

8

medical pvc floor

1. leveling and cleaning of the ground base

2.absorbent interface treatment agent

3.2~3mm thick super self-leveling

4. use special adhesive to stick the joints and the surrounding areas with special rollers for compaction (the base layer and the back of the floor are glued at the same time)

5.2mm thick homogeneous and transparent pvc rubber floor, seam welding seam sealing treatment on the surface of the roll material, waxed to produce light

m2

56.9

9

scattered openings on the top wall, including reinforcement

1. reserve the opening for the air conditioning copper pipe.

2. make a hole in the ground to reserve a floor drain. see the drawing for details.

indivual

6.0

10

wall and floor grooves

1. thickness restoration of grooved buried pipes on walls and floors

2. see drawings for details

item

1.0

11

finished furniture handling

customized low cabinets are dismantled and transported, and finished furniture cabinets are transported protectively.

item

1.00

12

construction waste removal and disposal

construction waste removal and disposal

m3

12.00

13

finished product protection

finished protection of surrounding rooms and aisles

m2

50.0

14

comprehensive renovation of civil engineering

other comprehensive sporadic employment

item

1.00

15

box fan

processing air volume: 1000m3/h, static pressure: 400pa, power kw: 0.55

tower

1.00

16

box fan

processing air volume: 1200m3/h, static pressure: 400pa, power kw: 0.55

tower

1.00

17

galvanized steel air duct

galvanized steel air duct, common plate flange production and installation, thickness 0.5mm-1.0mm, including installation accessories and brackets

25.00

18

rubber plastic insulation cotton

b1 grade rubber and plastic insulation cotton, thickness 30mm, bonded with special insulation glue

25.00

19

manually adjustable damper

galvanized steel plate material, 250*200mm

indivual

2.00

20

venturi valve

1. air volume adjustment device.

2. the product has a certain ability to prevent natural exposure. according to gb/t 9276, the coating was tested for natural climate exposure. no obvious changes were seen on the surface of the product, and there was no bubbling, cracking, or powdering in the surface coating. the above test results must provide a copy of the test report issued by a third-party testing agency with cma or cans certification and stamped with the official seal of the supplier, and the test time in the report must be no less than three months.

indivual

1.00

21

single layer louver air outlet

made of aluminum alloy, with nylon filter, removable for cleaning, 600*300mm

indivual

2.00

22

interior wall openings

interior wall opening, cutting, sealing, etc.

indivual

2.00

23

single layer rainproof louvers

made of aluminum alloy, with stainless steel insect-proof net, removable for cleaning, 800*500mm

indivual

1.00

24

rainproof and windproof box

galvanized steel plate material, 800*500*300mm

indivual

1.00

25

system debugging

ventilation system debugging

item

1.00

26

molded case circuit breaker

specifications: 160a

indivual

1.00

27

power distribution cabinet

1. specifications: detailed design

2. please refer to the design system diagram for electrical configuration details.

3. installation method: bottom edge 1.4m from the ground, surface mounted

4. terminal wiring installation

5. basic channel steel, installation, rust removal and oiling

tower

1.0

28

metal bridge

1. name: hot-dip galvanized steel trough type bridge

2. specification: 200*100

3. jumper the ground wire

m

100.0

29

wiring

1. specifications: wdz-byj 4.0mm2

2. wiring form: threading in the pipe

m

300.0

30

power cable

1. name: wdzb-yjy-4*70+1*35mm2

2. laying method: bridge, pipe laying

m

100.0

31

power cable

1. name: wdzb-yjy-4*50+1*25mm2

2. laying method: bridge, pipe laying

m

10.0

32

power cable head

1. name: copper core cable terminal production and installation

2. model: within 120mm2

3.form: dry package

indivual

2.0

33

piping

1. specification: jdg25 2. configuration: light/dark configuration

m

150.0

34

single-connected two- and three-pole socket

1. specification: 10a 2. installation method: concealed installation

indivual

5.0

35

single three-pole socket

1. specification: 16a 2. installation method: concealed installation

indivual

2.0

36

ceiling removal and restoration

removal and restoration of original aluminum square tube ceiling (make bridge frame)

item

1.0

37

ppr water supply pipe

1. installation location: indoors

2. medium: water supply

3. material and specifications: pp-r dn15

4. connection form: hot melt connection

5. including disinfection and flushing

m

10.0

38

ppr water supply pipe

1. installation location: indoors

2. medium: water supply

3. material and specifications: pp-r dn25

4. connection form: hot melt connection

5. including disinfection and flushing

m

10.0

39

plastic drain pipe

1. installation location: indoors

2. medium: drainage

3. material and specifications: upvc de50

4. connection form: socket bonding

m

10.0

40

plastic drain pipe

1. installation location: indoors

2. medium: drainage

3. material and specifications: upvc de75

4. connection form: socket bonding

m

10.0

41

plastic drain pipe

1. installation location: indoors

2. medium: drainage

3. material and specifications: upvc de110

4. connection form: socket bonding

m

10.0

42

make a hole (punch a hole)

1. material of the hole-drilling part: concrete slab

2. hole size: within dn150

indivual

7.0

43

globe valve

1. material brass 2. specification, pressure level dn25 3. connection type threaded connection

indivual

1.0

44

water supply angle valve

1.material stainless steel

2. specifications and pressure level dn15

indivual

1.0

45

water supply angle valve

1.material stainless steel

2. specifications and pressure level dn25

indivual

3.0

46

high water seal floor drain

1. material stainless steel 2. model and specification dn75

indivual

2.0

47

cleaning port

1.material: plastic cleaning port

2. specification: dn100

indivual

1.0

48

cooling water tank

1.material: stainless steel

2. parameters: 500l

indivual

1.0

49

pipe insulation

b1 rubber plastic insulation pipe shell, thickness meets design requirements

m3

1.0

50

pipe support and hanger

1.material: angle steel bracket

2. others: including the production and installation of brackets, rust removal, painting, etc., in compliance with design requirements and specifications.

kg

1.0

51

uv lamp

indivual

4.0

52

fly killer lamp

indivual

2.0

53

other

optimize by adding or subtracting by yourself to meet functional and usage needs

1. total price limit: 175,000 yuan.

2. quotation requirements: this quotation must be quoted in rmb, including the required labor fees, material fees, machinery fees, technical measures fees, installation facilities, technical service fees (including patent royalties), transportation fees, and secondary handling. fees, packaging fees, construction personnel’s board and lodging fees, construction debris cleaning fees, finished product protection fees, corporate management fees, profits, fees, taxes, and risk factors will be fully considered.

3. product quality guarantee period: 36 months (the supplier must provide a letter of commitment with an official seal, and repair and improve defects existing during use), calculated from the date of project completion and acceptance.

4. the winning bidder will provide detailed design of later drawings for this project. after review and approval by the purchaser, construction and later acceptance will be carried out in accordance with the drawings.

※5. bidders are requested to go to the 4#5 floor of jinfeng laboratory to check the site on their own, and add or delete the listed items to optimize the pulsating vacuum sterilizer facilities, pure water machine facilities, and stainless steel soaking facilities in the renovated room. the functions and usage conditions such as the pool comply with the national standards for experimental animal environmental facilities and meet the needs for cleaning, disinfection and sterilization of cages and other items in the experimental animal center.

 

2. supplier qualification requirements

1. comply with the provisions of article 22 of the "government procurement law of the people's republic of china".

2. the business license is within the validity period.

3. have the third-level or above professional contracting qualification for mechanical and electrical installation projects in buildings or the third-level or above general contracting qualification for mechanical and electrical engineering construction. (suppliers must provide copies of relevant qualification certificates within the validity period).

 

3. inquiry schedule

1. inquiry release time: 10:00 on may 23, 2024

2. inquiry deadline: 10:00 on may 30, 2024

suppliers should send the quotation list and relevant attachments (which must be stamped with the official seal and scanned in color) before the inquiry deadline to the contact email cypyq@126.com. those who do not quote before the inquiry deadline will be deemed to have automatically given up.

the relevant attachments are as follows:

(1) a copy of the business license or other certification documents for the organization;

(2) a copy of the id card of the legal representative or person in charge of the unincorporated organization;

(3) if the contact is an illegal person, a power of attorney from the legal person must be uploaded with the official seal, as well as a copy of the contact’s id card;

(4) quotation list;

(5) (can be added if necessary)

 

4. quotation list

category

serial number

content

unit price (yuan)

quantity

total price (yuan)

1

2

3

4

5

6

...

...

...

total

 

5. contact information

contact person and contact information: teacher pan 13508367864

contact address: no. 313 jinyue road, chongqing high-tech zone