Inquiry announcement for the renovation and procurement project of the hazardous chemicals temporary storage room on the 5th floor of building 5#
1. basic situation of the project
1. project name: renovation of the hazardous chemicals temporary storage room on the 5th floor of building 5#
2. project location: jinfeng laboratory
3. procurement method: inquiry
4. procurement content: renovation of the hazardous chemicals temporary storage room on the 5th floor of building 5#. please see the table below for specific procurement information:
serial number |
project name |
project characteristics |
unit |
quantity |
1 |
civil wall demolition |
anti-riot partition wall demolition |
m3 |
8.00 |
2 |
ceiling removal |
ceiling keel + surface layer removal (protective removal based on site conditions) |
m2 |
14.46 |
3 |
door and window removal |
removal of old doors and windows |
m2 |
1.00 |
4 |
protective removal of doors and windows |
protective removal of doors and windows |
m2 |
1.00 |
5 |
garbage removal and disposal |
garbage removal and disposal |
m3 |
7.44 |
6 |
finished product protection |
finished product protection |
m2 |
14.5 |
7 |
explosion-proof lightweight partition wall |
rock wool sandwich color steel plate wall (thickness: 50mm) 2. the sandwich color steel plate and the wall beam are fixed with explosion-proof bolts. 3. the pulling rope has a breaking force of 2000kg. |
m2 |
7.56 |
8 |
aluminum gusset ceiling |
1. φ8 boom, two-way mid-range ≤ 1200, φ8 boom fixed to reinforced concrete floor 2. the u-shaped light steel main keel is 38*1.2 thick and the middle distance is ≤1200. place the main keel into the main keel hanger. use the 38-1 light steel main keel hanger. after leveling, connect the main keel and the φ8 boom. 3.v-shaped light steel auxiliary keel, middle distance 600 4.1.0 thick aluminum alloy gusset plate surface, specification 300*1200, embedded installation, special trimming strip for edge collection 5. caulking (optional) note: the u38 keel is not the keel for the upper level. the upper keel needs to be u60, φ8 boom or above. |
m2 |
7.00 |
9 |
comprehensive renovation of civil engineering |
other comprehensive sporadic employment |
item |
1.00 |
10 |
explosion-proof air conditioners and supporting outdoor units |
refrigeration capacity: 3.5kw, heating capacity: 3.85kw, power: 1.1kw; including installation accessories and brackets |
tower |
1.00 |
11 |
explosion-proof fan |
processing air volume: 1350cmh static pressure: 700pa power kw: 1.5 includes installation accessories and brackets |
tower |
1.00 |
12 |
activated carbon box |
processing air volume: 1350cmh; including installation accessories and brackets |
indivual |
1.00 |
13 |
brand new fan internal unit |
refrigeration capacity: 14kw, heating capacity: 8.9kw, power: 0.15kw |
tower |
1.00 |
14 |
fresh air fan supporting outdoor unit |
refrigeration capacity: 14kw, heating capacity: 16kw, power: 3.85kw |
tower |
1.00 |
15 |
galvanized steel air duct |
galvanized steel air duct, common plate flange production and installation, thickness 0.5mm-1.0mm, including installation accessories and brackets |
㎡ |
20.00 |
16 |
stainless steel air duct |
304 stainless steel air duct, stainless steel flange production and installation, thickness 0.5mm-1.0mm, including installation accessories and brackets |
㎡ |
20.00 |
17 |
rubber plastic insulation cotton |
b1 grade rubber and plastic insulation cotton, thickness 30mm, bonded with special insulation glue |
㎡ |
42.00 |
18 |
manually adjustable damper |
304 stainless steel material, 200*200mm |
indivual |
2.00 |
19 |
manually adjustable damper |
304 stainless steel material, φ110 |
indivual |
6.00 |
20 |
70℃ normally open fire damper |
304 stainless steel material, 320*200mm |
indivual |
1.00 |
21 |
70℃ normally open fire damper |
galvanized steel plate material, 320*200mm |
indivual |
3.00 |
22 |
electric sealing valve (explosion-proof type) |
electric switching actuator, 304 stainless steel valve body, 320*200mm |
indivual |
1.00 |
23 |
electric sealing valve (explosion-proof type) |
electric switching actuator, galvanized steel valve body, 320*200mm |
indivual |
1.00 |
24 |
double-layer louver air outlet sf5 |
aluminum alloy material, 600*300mm |
indivual |
1.00 |
25 |
single layer louver air outlet pf2 |
aluminum alloy material, 300*300mm |
indivual |
1.00 |
26 |
exhaust pipe |
galvanized steel plate material, 250*250mm, 2.4m higher than the roof |
indivual |
1.00 |
27 |
single layer rainproof louvers |
made of aluminum alloy, with stainless steel insect-proof net, removable for cleaning, 320*250mm |
indivual |
1.00 |
28 |
interior wall openings |
interior wall opening, cutting, sealing, etc. |
indivual |
3.00 |
29 |
ventilation system debugging |
ventilation system debugging |
item |
1.00 |
30 |
refrigerant pipe |
φ15.9×1.0mm, including 20mm rubber and plastic insulation cotton |
m |
10.00 |
31 |
refrigerant pipe |
φ12.7×1.0mm, including 15mm rubber and plastic insulation cotton |
m |
10.00 |
32 |
refrigerant pipe |
φ9.52×0.8mm, including 15mm rubber and plastic insulation cotton |
m |
10.00 |
33 |
refrigerant pipe |
φ6.35×0.8mm, including 15mm rubber and plastic insulation cotton |
m |
10.00 |
34 |
refrigerant pipe |
φ6.35×0.8mm, including 15mm rubber and plastic insulation cotton |
m |
10.00 |
35 |
support and hanger |
includes bracket and installation. |
kg |
2.00 |
36 |
air conditioner hole |
concrete |
item |
3.00 |
37 |
nitrogen for air conditioner pressure test |
fill air conditioner with nitrogen for pressure test |
item |
1.00 |
38 |
r410a environmentally friendly refrigerant |
filled with r410a environmentally friendly refrigerant |
KG |
5.00 |
39 |
condensate drain pipe |
u-pvc material, de32 |
rice |
10.00 |
40 |
air flow control device (venturi valve) |
1. using an electric stepless air volume adjustment device, any air volume can be set as needed during operation. 2. the test results meet the requirements that when the air volume is 520-550m³/h and the static pressure in front of the valve is 400pa, 500pa and 600pa, the air volume deviation is <±4%; when the air volume is 1000-1050 m³/h and the static pressure is 400pa and 500pa in front of the valve, the air volume deviation is less than ±4%. , under the condition of 600pa, the air volume deviation is <±4%; the gear air volume is 1250-1350 m³/h under the conditions of 400pa, 500pa and 600pa static pressure in front of the valve, the air volume deviation is <±4%, and the test results all meet the requirements of covering layer thickness >35μm, tensile strength >70pa, elongation after break >45%, salt fog test protection level >9. (provide a copy of the test report with the cma or cnas mark within the validity period and stamp it with the official seal of the supplier) 3. the product has a certain ability to prevent natural exposure. according to gb/t 9276, the coating was tested for natural weather exposure. no obvious changes were seen on the surface of the product, and there was no bubbling, cracking, or powdering in the surface coating. the above test results must provide a copy of the test report issued by a third-party testing agency with cma or cnas certification and stamped with the official seal of the supplier. the test time in the report must be no less than three months; the test report shall be provided when quoting. |
item |
1.00 |
41 |
multi-line dismantling |
VQ-28 |
tower |
1.00 |
42 |
refrigerant pipe removal |
φ12.7×1.0mm, including 15mm rubber and plastic insulation cotton |
m |
10.00 |
43 |
refrigerant pipe removal |
φ6.35×0.8mm, including 15mm rubber and plastic insulation cotton |
m |
10.00 |
44 |
condensate drain pipe removal |
u-pvc material, de32 |
m |
10.00 |
45 |
galvanized steel air duct removal |
galvanized steel air duct, common plate flange production and installation, thickness 0.5mm-1.0mm, including installation accessories and brackets |
㎡ |
9.20 |
46 |
manual air valve removal |
galvanized steel plate material, φ110 |
indivual |
3.00 |
47 |
manual air valve removal |
galvanized steel plate material, 200*200mm |
indivual |
1.00 |
48 |
70℃ normally open fire damper removal |
galvanized steel plate material, 200*200mm |
indivual |
3.00 |
49 |
dismantling of double-layer louver air outlet sf2 |
aluminum alloy material, 300*300mm |
indivual |
1.00 |
50 |
explosion-proof fan dismantling |
P(FB)-W-5-2 |
tower |
1.00 |
51 |
civil sealing after demolition |
all things considered |
item |
1.00 |
52 |
nozzle removal |
remove the original sprinkler head |
indivual |
4.00 |
53 |
spray water pipe removal |
galvanized steel pipe material dn25 |
m |
12.00 |
54 |
spray water pipe removal |
galvanized steel pipe material dn40 |
m |
17.50 |
55 |
pressure relief port 500*500 |
pressure relief area 0.072㎡ |
indivual |
1.00 |
56 |
hanging heptafluoropropane fire extinguishing device |
xqq20/1.6 fire extinguishing design concentration 9%, fire extinguishing agent dosage 20kg with electromagnetic feedback device |
set |
1.00 |
57 |
wiring wdzbn-rvs-2*1.5mm2 |
1. wiring form: threading in the pipe 2. model: wdzbn-rvs 3. specification: 2*1.5mm2 4. material: copper core soft wire 5. wiring location: indoors [work content] 1. wiring 2. steel cable erection (tensioning device installation) 3. installation of support body (plywood, insulator, slot plate, etc.) |
m |
30.00 |
58 |
wiring wdzbn-byj2.5mm2 |
1. wiring form: threading in the pipe 2. model: wdzbn-byj 3. specification: 2.5mm2 4. material: copper core soft wire 5. wiring location: indoors |
m |
30.00 |
59 |
automatic alarm system debugging |
automatic alarm system debugging |
system |
1.00 |
60 |
removal of original light fixture socket |
removal of light fixture sockets and related pipelines, taking comprehensive considerations into consideration |
item |
1.00 |
61 |
explosion-proof lights |
specifications: 50w 2. ceiling installation |
set |
2.00 |
62 |
double single control explosion-proof switch |
specification: 10a 2. installation method: surface installation 3. comprehensive consideration of explosion-proof joints |
indivual |
1.00 |
63 |
explosion-proof socket |
specifications: explosion-proof socket 10a 2. installation method: concealed installation 3. comprehensive consideration of explosion-proof connectors |
indivual |
10.00 |
64 |
explosion-proof socket |
specifications: explosion-proof socket 16a 2. installation method: concealed installation 3. comprehensive consideration of explosion-proof connectors |
indivual |
1.00 |
65 |
ground flat steel |
specifications: 40*4 galvanized flat steel |
rice |
52.00 |
66 |
ground wiring |
1. specifications: 6 square meters of soft copper wire 2. wiring form: threading in the pipe |
rice |
1.00 |
67 |
wiring |
specifications: wdzc-byj 2.5mm2 2. wiring form: threading in the pipe |
rice |
100.00 |
68 |
wiring |
specifications: wdzc-byj 4.0mm2 2. wiring form: threading in the pipe |
rice |
100.00 |
69 |
ground wire |
specifications: wdz-byjr 4.0mm2 2. wiring form: threading in the pipe |
rice |
30.00 |
70 |
control line |
specifications: wdzb-kvv-4x1.5mm2 2. wiring form: threading in the pipe |
rice |
85.00 |
71 |
piping |
specifications: jdg20 2. configuration: light/dark configuration |
rice |
80.00 |
72 |
power cable |
1. name: wdzb-yjy-4*2.5mm2 2. laying method: bridge, pipe laying |
rice |
25.00 |
73 |
hd webcam (reuse old installation) |
3 million starlight network camera, dome, explosion-proof |
only |
3.00 |
74 |
signal line |
1. specifications: wdzc-ryy2*1.0mm2 2. wiring form: threading in the pipe |
rice |
20.00 |
75 |
signal line |
1. specifications: wdzc-ryy4*1.0mm2 2. wiring form: threading in the pipe |
rice |
20.00 |
76 |
category 6 network cable |
1. specification: upt-cat6 2. wiring form: threading in the pipe |
rice |
100.00 |
77 |
explosion-proof wireless ap |
explosion-proof wireless ap |
indivual |
1.00 |
78 |
intrinsically safe human body electrostatic discharger |
with static elimination indicator light |
set |
1.00 |
79 |
distribution box renovation |
replace the circuit breaker; 2. add a contactor; 3. wiring, etc. |
item |
1.00 |
80 |
explosion-proof switch button box |
1. explosion-proof type 2. surface mounted |
indivual |
2.00 |
81 |
automatic control box |
power supply: ac220v, 1kw; includes plc controller/ai module/ao module/di module/do module/communication module, ≥10-inch touch screen; realizes functions such as data detection and control of the exhaust system. |
set |
1.00 |
82 |
wind pressure probe-c |
power supply: dc13.5-33v, working environment temperature -10℃-50℃, humidity 5~95% (no condensation), monitoring range 1000pa/1500pa/3000pa optional |
indivual |
1.00 |
83 |
combustible gas alarm host |
wall-mounted installation, working voltage ac220v, can realize the remote alarm function of the computer client, and the alarm signal is transmitted to the fire control room |
tower |
1.00 |
84 |
sound and light alarm |
1. name: sound and light alarm 2. installation method: wall mounting, 2.2m from the ground |
indivual |
1.00 |
85 |
detector |
flammable, explosive and toxic gas detectors, matched with flammable gas alarm host |
indivual |
4.00 |
86 |
shielded signal lines |
specifications: wdzc-ryyp3*1.0mm2 2. wiring form: threading in the pipe |
m |
45.0 |
87 |
signal line |
specifications: wdzc-ryy3*1.0mm2 2. wiring form: threading in the pipe |
m |
55.0 |
88 |
piping |
specifications: jdg20 2. configuration: light/dark configuration |
rice |
100.00 |
89 |
overall system debugging |
overall system operation and debugging |
set |
1.00 |
1. the supply period of this project is 40 calendar days, and the total price limit is: 199,700 yuan.
2. quotation requirements: this quotation must be quoted in rmb, including the required labor fees, material fees, machinery fees, technical measures fees, installation facilities, technical service fees (including patent royalties), transportation fees, and secondary handling. fees, packaging fees, construction personnel’s board and lodging fees, construction debris cleaning fees, finished product protection fees, corporate management fees, profits, fees, taxes, and risk factors will be fully considered.
product quality guarantee period: 12 months, calculated from the date of project completion and acceptance.
3. the winning bidder will provide detailed design of later drawings for this project. after review and approval by the purchaser, construction and later acceptance will be carried out in accordance with the drawings.
2. supplier qualification requirements
1. comply with the provisions of article 22 of the "government procurement law of the people's republic of china".
2. the business license is within the validity period.
3. have the third-level or above professional contracting qualification for mechanical and electrical installation projects in buildings or the third-level or above general contracting qualification for mechanical and electrical engineering construction. (suppliers must provide copies of relevant qualification certificates within the validity period).
3. inquiry schedule
1. inquiry release time: 10:00 on may 20, 2024
2. inquiry deadline: 10:00 on may 23, 2024
suppliers should send the quotation list and relevant attachments (which must be stamped with the official seal and scanned in color) to the contact email dengenhua@jflab.ac.cn before the inquiry deadline. those who do not quote before the inquiry deadline will be deemed to have automatically given up.
the relevant attachments are as follows:
(1) a copy of the business license or other certification documents for the organization;
(2) a copy of the id card of the legal representative or person in charge of the unincorporated organization;
(3) if the contact is an illegal person, a power of attorney from the legal person must be uploaded with the official seal, as well as a copy of the contact’s id card;
(4) quotation list;
(5) (can be added if necessary)
4. quotation list
category |
serial number |
content |
unit price (yuan) |
quantity |
total price (yuan) |
1 |
|||||
2 |
|||||
3 |
|||||
4 |
|||||
5 |
|||||
6 |
|||||
7 |
|||||
8 |
|||||
total |
5. contact information
contact person and contact information: teacher deng 19923812674
contact address: no. 313 jinyue road, chongqing high-tech zone
- About Us
-
Research Platform
- Major Disease Sample Database
- Innovative Drug Verification And Transformation Platform
- Experimental Animal Center
- Life And Health Future Laboratory
- Biomedical Imaging Platform
- Cell Multi-Omics Platform
- Pathology Technology Platform
- Bioinformatics Research And Application Center
- Jinfeng Pathology Precision Diagnosis Center
- Research Team
- Information Center
- Join Us